Full Data Centre Migration to Cloud for National Retail Group
The outcome

100% of data centre infrastructure migrated to Azure — data centre fully decommissioned. We delivered this outcome for National Retail Group (500 users across 18 stores) by combining Azure, Azure Site Recovery, Azure Front Door into a single strategic engagement.

45% reduction in infrastructure costs — from £72,000/year to £39,600/year
Zero e-commerce downtime throughout the 14-week migration — 24/7 operations maintained
99.97% uptime achieved post-migration with multi-region Azure architecture
Disaster recovery time reduced from 48 hours to 2 hours with automated failover
01The Problem

What National Retail Group was facing

A national retail group with 18 stores across the UK was operating from a single on-premises data centre whose lease was expiring in 6 months. The data centre housed 12 servers running their e-commerce platform, inventory management, POS integration, customer database, and financial systems. They needed to migrate their entire data centre to the cloud within 6 months — with zero disruption to 24/7 e-commerce operations, no data loss, and a clear cost reduction. They also needed to improve their disaster recovery posture, as the single data centre was a single point of failure. The complexity of migrating 12 interdependent servers across 18 retail locations required a migration partner with deep expertise.

02Our Consulting Approach

How we solved it

We designed a comprehensive data centre-to-cloud migration strategy with a 5-month execution timeline. We began with a full dependency mapping of all 12 servers and their connections to 18 store locations, then designed a target Azure architecture with regional redundancy, Azure Front Door for global e-commerce load balancing, and Azure SQL Database for their customer data. We used Azure Site Recovery for continuous replication, migrated in 4 phased waves over 14 weeks, and ran parallel operations for 3 weeks before final cutover. We implemented Azure ExpressRoute for dedicated connectivity to all 18 stores, configured Azure Backup with geo-redundant storage, and designed a disaster recovery architecture with automated failover to a secondary Azure region. Post-migration, the data centre was fully decommissioned ahead of lease expiry.

03The Results

What we delivered

100% of data centre infrastructure migrated to Azure — data centre fully decommissioned
45% reduction in infrastructure costs — from £72,000/year to £39,600/year
Zero e-commerce downtime throughout the 14-week migration — 24/7 operations maintained
99.97% uptime achieved post-migration with multi-region Azure architecture
Disaster recovery time reduced from 48 hours to 2 hours with automated failover
Data centre lease decommissioned 3 weeks ahead of expiry — avoiding renewal penalty
E-commerce page load times improved by 35% with Azure Front Door CDN
All 18 stores connected via Azure ExpressRoute with 99.9% network availability
Technologies & Expertise

Tools and skills applied

AzureAzure Site RecoveryAzure Front DoorAzure SQL DatabaseAzure ExpressRouteAzure BackupWindows ServerDisaster RecoveryNetwork InstallationMonitoringDocumentation
Your Project Next

Get results like these for your business

Tell us about your project and a certified consultant will call you back within 10 minutes. No obligation, no pressure.

12 businessesrequested a consultation this week
10-min callback 100% private No spam, ever
FAQ

Questions about this case study

Common questions about the project, timeline, and results.

Ready when you are

Book your free consultation in 30 seconds.

No obligation. No spam. Just a certified engineer with a clear, proactive roadmap.

Response <60 min
Certified & insured
SLA-backed
No surprise fees